Head Loss & Velocity in Irrigation Pipes 
Today i am going to explain an important part of the drip irrigation design which is called Head Loss and Velocity in irrigation pipes. For providing proper water to the each plant of the field we must have to consider several things in mind like,
  1. Actual water requirement of the field
  2. Available flow of the pump
  3. Total Head Loss in the system & velocity in irrigation pipes
let’s see them in the brief,
Actual Water Requirement of the field

The first step of drip irrigation design is to calculate the total water required by the area. So how to calculate the water requirement? Let’s take an example,

Suppose we have 1.2 ha area and we are going to grow cotton crop in it at the spacing of 1.40m X 0.40m. We are going to use inline dripper capacity of 2 LPH (litre per hour).

So first thing is how many plants are there in 1.2 ha area? we can calculate it simply by,

1.2 X 10,000 = 12000 sq. meter

now,

= 12000 / 1.40 x 0.4 (Crop spacing)

= 21429 plants in the field

we are going to provide 2 litre water to each plant, so

Total water requirement = 21429 x 2 (Total plants x dripper discharge)

= 42,858 litre or 42.85 m3/hr.

so 1.20 ha are required 42.85 m3/hr. water to irrigate cotton crop.


Available flow of the pump

In the above example we’ve pump of 10 HP and water depth is about 25m. so what is the available flow of the pump set?

well we can calculate it with the device called water meter which is shown below,


Water Meter


There are many types of water meters available now a days. You can calculate the approximate pump flow with the following formula also.

Pump Discharge   =   Motor HP X 2.77 X Pump efficiency
                                               Head (m)
“ You can get details on every part of this formula in my previous post”

So we have pump set flow of about 36.93 m3/hr.

we can irrigate the field with maximum of 36.93 cubic meter per hour of water.
To carry these amount of water from water source to the field, we have to consider several things like Head Loss in pipes, Velocity etc.
In drip irrigation system the total head loss in Main line should not be more than 5m and 1.5m in sub main lines. And maximum permissible velocity is 2.0 m/sec.
we can calculate head loss and velocity with "Hazen Williams Formula”




Where,

  • Roughness constant for PVC pipe is 150
  • Pipe ID = (Pipe OD – Minimum Thickness of pipe) – Maximum Thickness of pipe

Total Head Loss (m) = (Length of pipe (m) X Pressure drop) / 100

Velocity can be calculated by,
Velocity


As we have seen all this calculation is bit a difficult to do. So i have created an excel sheet for calculating all the data above.

You can download it from Here.
it looks like,
image 1


You have to select pipe size and pressure rating from the list,

image 2


then enter the required flow of the area in the Available flow cell. You can enter the flow in various units like m3/hr., LPM (litre per minute) or LPS (litre per second) select the unit from the drop down list accordingly,

image 3

in the next field enter the length of the pipe in metre. As you enter these values it will gives Total Head loss, Pressure Drop and Velocity in the rest of the fields. If the result is according to the criteria ( Head loss not greater than 1.5 in sub main & Velocity not greater than 2.0) the fields are shown in green if the result exceed then it turns red. Which means we have to create a shift in irrigation.
For example,
In this case we have field requirement of 43 m3/hr. and pipe length of about 60 m so what is head loss?
image 4


well it is about 6.58 m, which is greater than 1.5m of so it turns red so what we have to do is to irrigate the field in two shifts. So available flow will be 43 / 2 = 21.5 & pipe length will be 60 / 2 = 30m for one shift.

image 5

as you notice head loss field turns green. But what about velocity ? it still red Confused smile
well it is red because if you are going to design a drip irrigation system for a large area then try to maintain velocity not greater than 1.5 m/sec instead of 2 m/sec of standard recommendations. for this case ignore the velocity of 1.5 m/sec as it is lesser than 2.0 m/sec & our area is small. Open-mouthed smile
If you are using HDPE Pipes then just scroll down the sheet you will find hydraulic calculator for HDPE pipes,
image 6


it is velocity based calculator so just enter required flow and select Pipe size and Pressure rating.

As you see all the units are in metric system of measurement. so if you are following units you have to convert the values Green with envy
don’t panic just click on the last sheet named “Unit Conversion” here you can convert different units.
image 7

That’s all for hydraulic calculation of irrigation pipes. Smile
Don’t forget to reply if you have any suggestion
cheers!!
Thanks Hot smile

Friday, January 13, 2012

Drip Irrigation Images

Hello everyone!!Smile

In my previous posts I’ve explained too many aspects of drip irrigation system. But as we all know,

One practical on site is far better then 1 month of learning in the classroom. Open-mouthed smileSo today i have done a little effort to show you the real drip irrigation system on field. Hope you all like it.

  • Intercropping in Mango with chillies.

07012011127

07012011128

  • Component fittings

07012011129

07012011130

07012011131

07012011132

07012011133

07012011134

07012011138

07012011141

23102010029

23102010030

23102010033

28102010044

DSC00474

DSC00475

End stop 8 shaped

Flush valve

Head Unit

Head unit_3 hydrocyclone

moto_0026

moto_0019

A small demo for Drip irrigation,

Thanks for watching,

Other articles
  • Product Support Agreements, Cement Systems  
  • iSeries Gas Analyzer Overview 
  •   1 2 3        
    Ramsey™
    Thermo
    AZUD
    AZUD
    AZUD
    AZUD
    Cage-Paktor®
    The
    Carbon
    Thermo
    Calcium
    J-Turbo
    AmnonDrip
    NaanPC
    NaanPC
    5024
    Super
    Ramsey
    Chevron
    Classical
    Narrow
    Rubber
    Rubber
    Tramp
    Ramsey*

    T&H AGRICULTURE AND TECHNOLOGY INVESTMENT JOINT STOCK COMPANY
    Head office: 6/36/101 254 Minh Khai Str.Hoang Mai Dist, Hanoi City, Vietnam
    Tel: (84 4) 3 910 8638  /  Fax: (84 4) 3 822 3629
    Email: th.agri.jsc@gmail.com ; info@th-jsc.com.vn /  Website: www.th-jsc.com.vn